ILED session closure by instructor posts Competency with an Acquired Date as session End Date, not the date of session closure. This can cause a future date to be posted in Salesforce (SFDC). For example an instructor creates an open session for the month, then schedules a "just-in-time" session for the student, and signs it off. The Acquired Date may be a date in the future, whereas the actual date of the training is required.
We would like to see a the Competency Acquired Date as an editable field. We manual assign competencies to users.