I have a Curricula Activity Report with 1160 items on it. Took so long to generate I finally clicked email me when ready. 2 hours later and I still don't have that report.
I tried again and filtered the report to 60 items and timed how long it took to generate a download.
After 30 minutes I had to give up waiting for the download to be created because I had work to do.
Imagine if a VP asked for this report to be sent to them and having to say I'll get that to you in 3-4 hours.
Can anything be done to get this back to the timeliness it took to export prior to the Admin Refresh.
Just tested this with an ILC Activity Report with 1300+ items (that the Admin Refresh screen hasn't been applied to) and it took less than 30 seconds to generate and excel download.
A filtered Curricula Report of the same size shouldn't take much longer.